Construction of 4 lanes Access Controlled New Greenfield Highway section of NH-365BG (Khammam – Devarapalle) of length 27.428 km from Recherla village to Gurvaygudem village (Design chainage 105+236 to 132+664) under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh. (Package – IV)
Project Contract Aspects
S. No | Description | Key Aspects |
1 | Contract type | PPP on Hybrid Annuity Mode |
2 | Bid date (Date of inception) | 7Th January 2021 |
3 | Date of LOA | 15th September 2021 |
4 | Authority | National Highway Authority of India |
5 | Road configuration | 4 Lane Highway |
6 | National Highway no. | NH365 BG (New) |
7 | National Highway route | Khammam – Devarapalli, Total length of 162.126 Kms |
8 | Project package | Package 4 of 5 (Andhra Pradesh) |
9 | Length of the road project | 27.428 Km. |
10 | Nature of project | Access Controlled Greenfield Highway |
11 | Construction period | 730 days (2 years) |
12 | Operation and Maintenance period | 15 years |
13 | Total Concession period | 17 years |
The Project site is part of the new National Highway NH365 BG from Khammam to Devarapalli, a greenfield 4 lane highway passing through new alignment in a plane and rolling terrain.
The project road starts at the crossroad junction of Sathupalli – Eluru State highway SH43, near Recharla village, and ends at the crossroad junction of Jangareddigudem – Eluru State highway SH-44, near Guravygudem village. The total length of the project road is 27.428 km.
The project passes through cropland (agriculture/horticulture) from Km.105.236 to Km 132.664
Description | Period | Anticipated Duration |
Project Construction/Development Period | 730 days (2 years) | April 2022 – April 2024 |
Project Operational Period | 15 years | May 2024 – May 2039 |
Total Concession Period | 17 years | April 2022 – May 2039 |
The Operation and Maintenance period for the project is 15 years and the key deliverables during the period shall be:
*Toll plaza operation shall be by the Authority
Authority | National Highways Authority of India |
Sponsors | M/s. BEKEM Infra Projects Private Limited, # Plot No. 289, Avenue-1, Road No. 06, Kakatiya Hills, Madhapur, Hyderabad – 500 081
M/s. Sri Avantika Contractors (I) Ltd # D No. 8-2-603/23/3&15, 3rd floor, HSR Summit, Besides No.1 news channel, Road No. 10, Banjara Hills, Hyderabad-500034
|
Project Company | JANGAREDDYGUDEM PROJECTS PRIVATE LIMITED (JPPL) # 3rd Floor, P.No.289, Avenue-1, Road No. 06, Kakathiya Hills, Guttala Begumpet, Hyderabad- 500 081. |