JangaReddyGudem Projects

Jangareddygudem Projects Private Limited

Construction of 4 lanes Access Controlled New Greenfield Highway section of NH-365BG (Khammam – Devarapalle) of length 27.428 km from Recherla village to Gurvaygudem village (Design chainage 105+236 to 132+664) under Bharatmala Pariyojana Phase-I in the state of Andhra Pradesh. (Package – IV)

Key Aspects for the Project

Project Contract Aspects

S. No

Description

Key Aspects

1

Contract type

PPP on Hybrid Annuity Mode

2

Bid date (Date of inception)

7Th January 2021

3

Date of LOA

15th September 2021

4

Authority

National Highway Authority of India

5

Road configuration

4 Lane Highway

6

National Highway no.

NH365 BG (New)

7

National Highway route

Khammam – Devarapalli, Total length of  162.126 Kms

8

Project package

Package 4 of 5 (Andhra Pradesh)

9

Length of the road project

27.428 Km.

10

Nature of project

Access Controlled Greenfield Highway

11

Construction period

730 days (2 years)

12

Operation and Maintenance period

15 years

13

Total Concession period

17 years

Location of the Project Corridor

The Project site is part of the new National Highway NH365 BG from Khammam to Devarapalli, a greenfield 4 lane highway passing through new alignment in a plane and rolling terrain.

 

The project road starts at the crossroad junction of Sathupalli – Eluru State highway SH43, near Recharla village, and ends at the crossroad junction of Jangareddigudem – Eluru State highway SH-44, near Guravygudem village. The total length of the project road is 27.428 km.

 

The project passes through cropland (agriculture/horticulture) from Km.105.236 to Km 132.664

Project Timelines

Description

Period

Anticipated Duration

Project Construction/Development Period

730 days (2 years)

April 2022 – April 2024

Project Operational Period

15 years

May 2024 – May 2039

Total Concession Period

17 years

April 2022 – May 2039

Operation & Maintenance

The Operation and Maintenance period for the project is 15 years and the key deliverables during the period shall be: 

 

  1. Preventive maintenance for roads and major structures
  2. Traffic management system
  3. Accident response with dedicated teams 
  4. Repair of damaged works 
  5. Project facilities management including plantations and amenities.

 

*Toll plaza operation shall be by the Authority 

AuthorityNational Highways Authority of India
Sponsors

M/s. BEKEM Infra Projects Private Limited,

# Plot No. 289, Avenue-1, Road No. 06,

Kakatiya Hills, Madhapur, Hyderabad – 500 081

 

M/s. Sri Avantika Contractors (I) Ltd

# D No. 8-2-603/23/3&15, 3rd floor, HSR Summit,

Besides No.1 news channel, Road No. 10, Banjara Hills, Hyderabad-500034

 

Project Company

JANGAREDDYGUDEM PROJECTS PRIVATE LIMITED (JPPL)

# 3rd Floor, P.No.289, Avenue-1, Road No. 06,

Kakathiya Hills, Guttala Begumpet, Hyderabad- 500 081.